     06/27/13 - added pictures.

 

The fuel system is installed in the center console.  This is the fuel shutoff valve.

Baggage compartment center console where the fuel pump is located.

Forward center console and the fuel flow totalizer.

The gascolator is installed on the firewall.

Upper firewall section installed.

Instrument tray and brackets installed, ready for the panel.

The brackets that hold the oil tank are assembled onto the firewall.

Then the upper fuselage skin is attached.

Finally, the instrument panel and map box are installed.

The fuselage kit is now completely installed.

Another view of the completed fuselage.

This completes all the work from the Fuselage kit.  Work continues with the Finish kit.  You can see that work on the next page.